Listed below are some of the projects managed by PMX personnel. All of them resulted in significant cost savings and/or prevented plant shut down or hardware  modifications. Details available on request.
 

Uprating of a PWR plant: 2758 MWt to 3083.4 MWt (gain of over 100 MWe)
Guidelines for BWR plant thermal power upgrades
Decontamination project for Nuclear Piping/Components to reduce contamination
Decommissioning Alternatives and cost studies
 
Water-to-Air heat exchangers under evaporative conditions (patent/papers)
Transient analysis of Condensate flow rate and pressures (ASME paper)
Computer simulations for Nuclear Containment Fan Cooler Unit performances
Polytrophic Index of Nitrogen gas as it expands in a Tank (ANS paper)
Low Pressure Turbine Flow Guide change to gain 9 MWe
Investigations of BOP equipment to improve plant performance
Analyzed/designed gas explosion prevention for aircrafts and electric manholes
Developed system logic to simulate TCV not available for Liquid Nitrogen System
New technology (patents) that significantly reduces freeze/thaw times and LN2 usage for repair of underground pipes containing dielectric fluid and electric cables